About us

Logistics

Collection, Material removal and recycling, redundant asset management

  • Artic Vehicles
  • Ridged Vehicles
  • Flat bed
  • Bulkers
  • Curtain Sided Lorries
  • Hiab / Crane Lorries
  • Night time / Weekend Collections and deliveries
  • Ballast Collection / delivery
  • Sleeper Collection / delivery
  • Rail Collection / delivery

 

Track Removal / Uptake

Installation

Supply

Track Removal:

All track uptake and removal contractors are considered regardless of size. A recent contract we completed involved the removal of 40km of Railtrack.

 

Installation:

We recently installed a heavily curved track for the fire service in an education and safety training centre. The track was mainline gauge on concrete sleepers with a 3rd rail system with an extreme radius as it was to fit into a circular building.

Supply:

We can supply simple but essential items such as fishplates quickly by courier or national delivery networks, alternatively we can supply larger projects with pre-assembled track or loose rails, sleepers and components to suit.



---