About us
Logistics
Collection, Material removal and recycling, redundant asset management
- Artic Vehicles
- Ridged Vehicles
- Flat bed
- Bulkers
- Curtain Sided Lorries
- Hiab / Crane Lorries
- Night time / Weekend Collections and deliveries
- Ballast Collection / delivery
- Sleeper Collection / delivery
- Rail Collection / delivery
Track Removal / Uptake
Installation
Supply
Track Removal:
All track uptake and removal contractors are considered regardless of size. A recent contract we completed involved the removal of 40km of Railtrack.
Installation:
We recently installed a heavily curved track for the fire service in an education and safety training centre. The track was mainline gauge on concrete sleepers with a 3rd rail system with an extreme radius as it was to fit into a circular building.
Supply:
We can supply simple but essential items such as fishplates quickly by courier or national delivery networks, alternatively we can supply larger projects with pre-assembled track or loose rails, sleepers and components to suit.

